Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
DTP 1.5 Rampdown Policy
Revision as of 12:59, 27 February 2007 by Unnamed Poltroon (Talk)
Status
2/27: This document is a draft and has not been reviewed/approved by the PMC.
Purpose
This document defines a set of rampdown cycles for DTP 1.5. The goal is to ensure that DTP stability and completeness converges on the 1.5 release dates, while allowing mechanisms for changes as necessary. Since this document is about the rampdown, only cycles post DTP 1.5RC0 will be detailed below.