Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

EGF Build Portfolio

Revision as of 19:43, 8 April 2011 by Unnamed Poltroon (Talk) (Rationale)

Portfolio Name

Build Portfolio

Objective and scope

The objective of the Build Portfolio is to edit a build chain and next generate all the associated files for a release engineering target platform in order to manage and control a build chain.

The purpose is not to have an exhaustive, and then complex, build description. The build description must be simple with the possibility to describe large build chains.

The portfolio targets first Hudson and Buckminster.

Rationale

MDA principle

In OMG's MDA terms, the edited model represents the PIM and the build chain against a build target platform represents the PSM.

The PIM-to-PSM transformation is realized by a generation ensured by EGF. During this generation 1) the build model is transformed to be optimized, 2) the transformed model is checked, 3) files for the target platform are generated.

Concepts

[TBD]

Process

[TBD]

Example

[TBD]

References

[TBD]

Back to the top