Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Minutes of Community Calls"
(→Agenda - 11-June-08) |
(→Agenda - 25-June-08) |
||
Line 34: | Line 34: | ||
== Agenda - 25-June-08 == | == Agenda - 25-June-08 == | ||
− | * update on | + | * update on legal situation (Jimmy, Ruth) |
+ | ** We will upgrade to DOJO 1.1 in i12 to expedite the process | ||
+ | ** In order to release, not only does DOJO need to be approved by Eclipse Legal, but the other IPZillas for which we have parallel IP approval must be fully approved as well. This is the [https://dev.eclipse.org/ipzilla/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&product=technology&component=technology.cosmos&long_desc_type=substring&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&keywords_type=allwords&keywords=&bug_severity=approved&bug_severity=awaiting_analysis&bug_severity=awaiting_board_approval&bug_severity=awaiting_committer&bug_severity=awaiting_project&bug_severity=awaiting_pmc&bug_severity=awaiting_emo&bug_severity=awaiting_triage&bug_severity=closed&bug_severity=exempt_prereq&bug_severity=workswith&bug_severity=prereq&bug_severity=new&bug_severity=rejected&bug_severity=reuse&bug_severity=triage&bug_severity=under_review&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= list of IPZillas open for COSMOS] and this is the [https://dev.eclipse.org/ipzilla/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&product=technology&component=technology.cosmos&long_desc_type=substring&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&keywords_type=allwords&keywords=&bug_severity=awaiting_analysis&bug_severity=awaiting_board_approval&bug_severity=awaiting_committer&bug_severity=awaiting_project&bug_severity=awaiting_pmc&bug_severity=awaiting_emo&bug_severity=awaiting_triage&bug_severity=workswith&bug_severity=new&bug_severity=rejected&bug_severity=reuse&bug_severity=triage&bug_severity=under_review&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= list of IPZillas that are not yet approved]. | ||
* status of the M3 driver? Ready to release this week? | * status of the M3 driver? Ready to release this week? |
Revision as of 08:41, 25 June 2008
Contents
Community Meeting
Meeting Title: | Conference Call on COSMOS Community Meeting |
Link to information on Wiki: | COSMOS Main Page |
Date & Time: | Wednesdays, at 1000 ET / 10:00am ET |
Toll-free Dial-in number (North America): | +1 866-376-6162 |
Primary International Dial-in: | 660-422-5140 |
UK Dial-in: | 0808 234 8022 |
Passcode: | 908 874 7480 |
Contact
Email Toni Drapkin
Phone +1 (919) 254.5224, or
Email Ruth Lee
Agenda - 25-June-08
- update on legal situation (Jimmy, Ruth)
- We will upgrade to DOJO 1.1 in i12 to expedite the process
- In order to release, not only does DOJO need to be approved by Eclipse Legal, but the other IPZillas for which we have parallel IP approval must be fully approved as well. This is the list of IPZillas open for COSMOS and this is the list of IPZillas that are not yet approved.
- status of the M3 driver? Ready to release this week?
- i12 plan
- Not everything on the plan has a design doc or use case?
- Prioritization by the various contributors
- i12 plan
- Technical review of documentation. (Rich)
- Any last input to Rich? This week is his last week working on COSMOS.
- User's Guide
- Developer's Guide
- Around the room
Reference
2008 Minutes of prior meetings
February 22, 2008 - i9 Checkpoint
2007 Minutes of prior meetings
November 27, 2007 - COSMOS i7 Close Down Meeting Minutes
2006 Minutes of prior meetings
November 30, 2006 - Minutes - Data Reporting Meeting